Back to Projects La Frontera 360 lf of screening. The size and placement of the mechanical equipment demanded a combination of unit-supported screen and equipment screen attached to structural...
Back to Projects Christian Care Center 4 equipment screens, for 246 total lf of screening. Various roof levels and roadside sightlines required flexibility to meet city codes. Many screens on this project hide multiple types of equipment. Horizontal R-Panels were used...
Back to Projects LSTC A single screen around two RTU’s at each location. Skylights in the roof, widely spaced equipment, and varying equipment heights resulted in a screen design that had to fit some tight parameters. Vertical R-panels with darker colors are used to...
Back to Projects Southwest Parkway 150 lf of screens Silver Metallic Corrugated Panels were installed for the screens on this tall office building in Austin, TX. Wind loads at the location were taken into account. Further obstacles from ductwork and access led to a...
Back to Projects Parker Square 245 lf of screens The building designers looked for a screen design that echoed the building shape. Diagonal joints and steel coordination were used to accomplish a design to meet everyone’s needs. Construction is slated for early...